Water System Improvement Project

Milestones

Project Description

The Town of Edisto Beach water supply comes from groundwater wells in the Santee Limestone aquifer.  This water supply has elevated levels of chloride, fluoride, and sodium concentrations that affect taste and may cause corrosion in the distribution system and residential plumbing and appliances.  The water improvement project was implemented to reduce the mineral content in the water and provide adequate supply to meet high seasonal demands during the summer tourist season which far exceed the demands during the winter months.  The project consists of combining reverse osmosis water treatment with additional supply and storage to resolve the dual problems of water quality and water supply.  

The project site is located at 2502 Lee Street.   The project consists of installing three new 10-inch wells approximately 580 feet deep with submersible pumps and variable frequency drive motors and transmission lines connecting the three wells to the water improvement facility.  The plant will house three reverse osmosis treatment skids each with a permeate capacity of 320 gallons per minute for a combined treatment capacity of 1,200 gallons per minute, including a 20% blend with  raw well water, chemical systems, motor control center, emergency generator, high service pumps, control room including a supervisory control and data acquisition (SCADA) computer control system, office and restroom. The water treatment discharge line will consist of approximately 1,900 feet of line into the Atlantic Ocean.   A concrete clearwell is being constructed under the treatment plant building to provide additional storage of 290,000 gallons.  Automatic control valves will be installed on the fill line of both the existing elevated storage tank and the ground storage tank to control the filling of the tanks for water demand. 

Project Resources

  • Bond Attorney-Howell Linkous & Nettles

    Financial Advisor-Municipal Advisors

    Underwriters-Raymond James and Oppenheimer& Co.

    Rating Agency-Standard and Poors

    Auditor-K Eve McCoy

    Rate Study-American Engineering Consultants, Inc.

    Custodian-US Bank National Association

    Iris Hill, Project Manager

    Bond $7,255,000 issued July 18, 2017 ($7,200,000 project $55,000 bond costs)

    Phase I-$90,000 (Water R&R)

    Change Order Settlement $125,000 November 20, 2020

    Final Cost $7,470,000

     

  • Wharton Smith-Prime

    Thomas and Hutton-Prime Engineer

    Harn RO - Prime Reverse Osmosis

     

    Subs

    McCall Brothers-Well Drillers

    Stono Concrete, Inc.- Concrete

    Doka USA, Ltd- Formwork

    Harris Rebar North Carolina, Inc. -Rebar

    Halliday Products, Inc. - Hatches

    Pete Duty & Associates-Vertical Turbine Pumps and pump screens

    Henry Pratt Company LLcC-Slide Gate

    Arco Building Systems, Inc-Pre Engineered Metal Building

    Fortiline Inc.-Pipes and Valves

    Robert Frank Land Surveying - Surveying

    Murdaugh's Tree Service - Tree Trimming

    Terracon Consultants-Testing

    JR Wilson-Sitework

    Carroll Enterprises-CDL Directional Drilling

    Door Systems of Charleston-Overhead Doors

    The Bay Company-Silt Fence

    Southern Fiber-Pipe Testing Asphalt Bike Path/Road, RW Pipeline

    Mid State-Raw Water Line

    SCE&G-Relocate Power Lines

    Logan Diving-Discharge Line

    Mid State Masonry-Masonry

    Kintz Electric LLC-Temporary Power

    Gate Precast Company-Precast Hollowcore Slabs

    Tony Goodwin-Place Concrete

    R&R Rebar Reinforcing, Inc.-Reinforcing Steel Install

    Square D-MCC Gear

    Gregory Electric-Electrical

    B&F Mechanical-Plumbing

    WS Contractors of Goose Creek-Exterior Finishes

    Blanchard Machinery Company-Generator

    Knights Precast-Sanitary Manhole

    Dorsett Technologies, Inc.-SCADA

    Wolfe Contractors, LLC -PEMB Erection

    Harrelson Painting, LLC-Concrete Coating Clearwell

    B&F Mechanical-Plumbing

    Carolina Services-Interior Finishes

    Causey's Tiger Air-HVAC

    KL Shane-Static Mixer

    Carotek, Inc.-Valve Actuators

    Atlantic Valve and Equipment-Check Valves

    Dexurik Inc-Valve package

    Chet Adams Company, Inc.-HVAC

    Pentalift Equipment-Scissor Lif

Project Updates

  • Change Request Finalized

    Wharton Smith and Town of Edisto Beach finalized negotiations regarding the $1,332,000 change order request.   Final payment of $125,000 was agreed upon due to delays from the Sarah Mckenzie et al lawsuit, increase in building size, concentrate discharge line changes, additions of the chemical lifting system and divider wall to name a few.  This was paid using interest earned on the borrowed funds so there is no impact to the water rates. 

  • Change Request

    Wharton Smith submitted a change request for the GMP project. 

  • Transmission of Water

    The water plant is operational.  Reverse Osmosis water is being produced and transmitted to homes. 

  • Plant Operations

    The Engineering Firm submitted the final permit submission to DHEC on February 27, 2020.  Once the submission has been reviewed and approved, they will issue a permit to operate.  At that time we will begin filling the tanks and tower for distribution.  

  • Start Up Phase

    The RO project is now in the startup phase.  Harn RO is onsite and the membranes have been installed.  Water testing is ongoing.  We anticipate having DHEC approval to operate in February.  

    Please note that when distribution of water begins, there will be some discoloration and sediment.  If you are using a Reverse Osmosis system in your home you may want to speak with your vendor to discuss how it may impact your system if it is operating when distribution begins. Once distribution begins, the Town will no longer operate or maintain the RO dispensing station at Town Hall.

     

    Water Improvement Project January 2020

  • Erection of Pre-Engineered Metal Building

    Pre-Engineered Metal Building

  • Erection of Pre-Engineered Metal Building

    Pre-engineered metal building

Project Images